Link to SANY
Change language: 
Putzmeister international
Extranet

Tubular column system RS 850




The RS 850 tubular column system comes with 3 m, 6 m or 9 m columns as standard, with standard pipeline lengths. Different tubular columns for setting up the boom pedestal and arm assembly are not required. The double M tubular column profile requires only one simple, square cut-out (1 m x 1 m) in the floors. By using an adapter, existing booms can continue to be used with the RS 850 tubular column.


Flexible and quick setup

The placing boom can be set up in different ways

The quick disconnect systems

Get more information about multi-boom- und T disconnection point.

Automatic climbing process

The climbing of the tubular column is carried out automatically.

Well thought out details

 

Name:
Passwort:

Homepage Sitemap Impressum Print page
Enter your search here.

Feedback
 
Find us on Facebook